PRINCIPLE CHARACTERISTICS
Single component
Water clean-up
Environmentally friendly, non toxic
Ease of application
Tenacious bond
Suitable for most substrates
High tensile film strength
Does not bleed or leach
Low water vapour transmission
USE AREAS
Internal Wet Areas and Shower Recesses
External Balconies and Decks (must be over coated)
Tanking
Water features
GENERAL
|
Colour
|
Grey or Green
|
|
Weather Resistance
|
Must be over coated
|
|
Dry Time
|
2-4 hours @ 25
o
C
|
|
Recoat Time
|
4-6 hours @ 25
o
C
|
|
Coverage
|
Min 2 coats, each @ 1.0 litres/m2[1.0m2/litre]
|
|
Wet Film per coat
|
1.00mm thick
|
|
Dry Film Thickness
|
1.2mm total
|
|
Elongation @ break
|
300% @ 25
o
C
|
|
Moisture Vapour transfer
|
0.42g/m2
24hour
|
|
Solids Content
|
58% by volume
|
|
Shelf Life
|
12 Months in unopened container @ 20
o
C
|
PACKAGING
15 Litre
4 Litre
CLEANUP
DURO MASTIC TOUGHSET
may be cleaned from equipment with water when still wet.
INSTALLATION
SURFACE PREPARATION
Ensure linings are firmly fixed to manufacturer's directions. Surface must be free of dirt, dust, loose particles, oil, contaminants and curing compounds etc. Concrete must be a minimum strength of 20mpa and have cured a minimum of 28 days. Surface must be dry. Fill all screw holes, cracks and voids with neutral-cure silicone. Install leak control flanges to all pipe penetrations.
PRIMING
Prime fibre cement board, sound concrete and block work with Durotech
ARW Primer
internally. For external applications prime with Durotech
AR Sealer
applied at approx. 6m2/litre. Damp areas and areas subject to rising damp should be sealed with
DUROMIX WBE
. Allow primer to dry prior to membrane application
.
All PVC fittings to be etch primed.
DETAILING
Apply a 12mm fillet of neutral cure silicone between all horizontal and vertical junctions such as floor to wall, wall to wall, all hob junctions and any joints in the substrate. Apply neutral cure silicone around penetrations and outlets. Where angles are installed, such as across bathroom doorways or under shower screens (hobless showers), the angle must be firmly adhered. Joints, corners & other details shall be reinforced with polyester bandage or
Duro Flashing Tape
which must be fully wetted out with out wrinkles or bubbles.
APPLICATION
To the primed surfaces, apply
DURO MASTIC TOUGHSET
by brush or roller
in at least two
or more coats to achieve a minimum dry film thickness of 1.2mm. Do not apply in 1 coat. Turn membrane up to walls, penetrations and down into drainage outlets. When dry, check for pinholes and recoat if necessary. If membrane becomes dirty or damaged between coats, clean with water and recoat
.
All sheet flooring must be fixed to the manufacturers directions before membrane is applied. Do not apply above 30
o
C or below 10
o
C ambient.
FLOOD TEST & TILING
A flood test may be carried out after 72 hours of drying, @25
o
C, 50% R.H. Water shall cover to a depth of 25mm for approximately 2 hours.
DURO MASTIC TOUGHSET
may be tiled over after 3-4 days @25
o
C, 50% R.H., using a quality cement based tile adhesive installed as per AS 3958.1.
STORAGE
Stored in unopened original containers @ 20
o
C,
DURO MASTIC TOUGHSET
has a
shelf life of 12 months.
HEALTH & SAFETY
Refer to
DURO MASTIC TOUGHSET
MSDS prior to use.
|